Weight per meter: kg/m = V × Density Total base: Total = (kg/m × Length) + (Joints × Coupler kg) Installed total: Installed = Total × Safety factor Ladder trays use a practical approximation: two rails plus average rung material per meter based on rung spacing. The Cable Tray Weight Calculation involves considering various factors, including tray specifications, material, and thickness. In this guide, we'll walk you through the step-by-step process for calculating cable tray weight, while providing examples for both channel trays and ladder trays. This. Values are applicable to all resin systems, where possible. Nominal loading depth (as required): 2” (51mm), 3” (76mm), 5” (127mm), 7” (178mm) and 9” (229mm) 4. Our product is both CSA and UL certified, and utilizes the latest innovations in manufacturing techniques. Unitray is proud to be 100% Canadian owned and the following catalogue.